- What is a construction classification (classification based on ordering, cost burden, and contractor designation)?
-
Details of each construction category and differences in construction targets
A Construction: Construction work that affects the entire building and is paid for by the building owner
B Construction: Construction work on the entire building, with the tenant paying for it and the owner designating a contractor
C Construction: Interior construction carried out by the tenant -
Important points to note and troubleshooting measures for each construction category
A Construction Precautions
B Construction Precautions
C Construction Precautions - If you want your office relocation or renovation to proceed smoothly, leave it to ITOKI!
Do you know the term "construction classification"? Many people may have heard of A construction, B construction, and C construction, but would like to know more about how they differ and how much the tenant is responsible for.
In this column, we will clearly explain the categories of construction work that occurs during office relocations and renovations, as well as their respective characteristics and points to note.
What is a construction classification (classification based on ordering, cost burden, and contractor designation)?
A construction classification is an agreement to clarify the contractor, the builder, and the cost bearer for a construction project.
It is generally classified as follows from three perspectives: "Who orders the construction?", "Who bears the construction costs?", and "Who designates the construction contractor."
[Classification table for A construction, B construction, and C construction]
Client |
Costbearer |
Contractordesignation |
Examples of applicable construction projects | |
A Construction |
Owner |
Owner |
Owner |
Building exteriors, elevators, shared toilets, etc. |
B Construction |
tenant |
tenant |
Owner |
Partitions, interior finishing, air conditioning equipment, power supply work, water supply and drainage work, etc. |
C Construction | tenant | tenant | tenant | Furniture installation, LAN wiring, etc. |
This construction classification is clearly stated in the "Construction Classification Table" in the rental contract or special agreement. Depending on the contract, it may not be as stated above, so it is important information to check when considering office relocation or renovation.
Details of each construction category and differences in construction targets
Now let's take a closer look at each construction division.
A Construction: Construction work that affects the entire building and is paid for by the building owner
A construction is mainly related to the common areas and structure of the building (structurally important parts that support the entire building, such as the foundation and pillars) of the building, such as the exterior of the building and elevators. The owner, who is the landlord, places an order with a designated construction company and bears the costs.
[Main target of A construction work]
- Construction of exterior and interior walls and roofs of buildings
- Elevator construction
- Shared toilet construction
- Construction of stairs and common passages
- Firefighting equipment construction for common areas and the entire building
- Water supply and drainage facility construction for common areas and the entire building
◇ ◇ ◇
When moving in as a tenant, it will generally be rare for the lessee to be directly involved in construction work A.
If you have any requests or concerns before moving in, you may be able to consult with the owner and ask them to carry out the necessary work before signing the contract. However, even if the above applies, work carried out at the request of the tenant will often be classified as B work, with the tenant bearing the costs, so it is essential to consult and confirm at the time of signing the contract.
B Construction: Construction work on the entire building, with the tenant paying for it and the owner designating a contractor
B construction work is mainly carried out in tenant-occupied areas and has the potential to affect the entire building.
[Main targets of B construction work]
- Air conditioning equipment construction
- Electrical installation work (distribution boards, wiring, lighting, etc.)
- Mainly construction of disaster prevention equipment within tenants
- Mainly water supply and drainage facility construction within tenants
- Partition wall construction
- Interior finishing work (wallpaper, carpet, painting, etc.)
◇ ◇ ◇
For B construction, the tenant is responsible for the costs, but in most cases, the selection of the construction company and price negotiations with the owner are required. To manage costs, it is important to gather sufficient information and make a plan in advance.
Even if the construction is in the common areas, if the tenant requests it, it may be included in B construction, and the definition of each construction may differ from that of the building before the relocation. Be sure to check carefully in advance.
C Construction: Interior construction carried out by the tenant
C-type construction work is construction work carried out primarily by the tenant in the exclusive area, such as interior work and installation of office furniture and equipment that does not affect the building as a whole.
[Main targets of C construction work]
- Furniture installation
- Office furniture installation
- Installation of office automation equipment
- Installation of lighting fixtures (excluding wiring and standard building lighting)
- LAN and other communication equipment construction
◇ ◇ ◇
In C construction, the tenant can choose the construction company, which makes it easier to control costs and allows the office to be built in a way that reflects the tenant's wishes as much as possible. However, when carrying out construction work, the building's construction conditions must be adhered to and the owner's approval must be obtained in advance before it can begin.
Important points to note and troubleshooting measures for each construction category

Now that we understand the characteristics of each construction category, let's take a look at the points to keep in mind and ways to avoid problems when actually proceeding with an office relocation or renovation, by construction category.
A Construction Precautions
Although construction work A is primarily the responsibility of the building owner, tenants also need to be aware of the following points:
Check the facilities in the exclusive area
Even in areas exclusively used by tenants, facilities already installed at the time of the tenant's move-in (such as air conditioning equipment and lighting fixtures) may be subject to construction A. Repairs and updates to these facilities may also be borne by the owner, so be sure to check in advance.
Contract review
Please check the contents of the lease agreement in detail and make sure you clearly understand the scope and conditions of construction A. If you have any questions or concerns, it is important to contact the owner directly.
Consideration for construction in common areas
Construction work in common areas such as elevators and shared toilets may affect the business activities of tenants. Be aware of these construction plans and inform employees and visitors as necessary.
B Construction Precautions
The cost of construction work B will be borne by the tenant, but as it will be carried out by a contractor designated by the owner, special attention should be paid to the following points.
Construction Schedule Management
Obtaining estimates for construction B projects takes longer than expected, so construction may start later than originally scheduled. It is important to set a schedule with ample time.
Since the construction will be carried out by a contractor designated by the owner, the construction schedule may be affected if construction B occurs at the same time in the same building.
In addition, unexpected problems may occur in construction work for water supply and drainage facilities, which may result in extended construction times. Be sure to include ample leeway in your schedule and make preparations to minimize the impact of delays.
Difficulty in budget management
Since there is no freedom in choosing a contractor, it becomes difficult to control costs. Be sure to hold sufficient prior discussions with the owner and reach a clear agreement on the details, costs, and schedule of the construction.
Check the specifications
Because the construction work will be carried out by a contractor designated by the owner, it is important to clearly communicate the tenant's requests and needs. Be sure to confirm in advance the quality and design of the materials and equipment to be used.
Responding to changes and additional construction
Be sure to discuss with the owner in advance the procedures and costs involved if any changes or additions are needed after construction has begun.
Consideration for neighboring tenants
B If the construction work is likely to affect other tenants (such as noise or vibration), you will need to work with the owner to take appropriate measures, such as providing prior notice and adjusting construction times.
Confirmation of restoration costs
Since the cost of restoring the premises to its original condition upon moving out is likely to be borne by the tenant, it is important to check in advance and estimate the budget. In particular, if you are installing special interior furnishings or equipment, be sure to plan with future restoration costs in mind.
C Construction Precautions
When carrying out tenant-led C construction work, please be aware of the following points:
Schedule Management
Make sure you understand the entire process and manage it appropriately so that the schedule for construction C does not overlap with other construction works (constructions A and B).
Setting a schedule that includes other construction work can require specialized knowledge, so if it is difficult to manage in-house, outsourcing the project management is one option.
[Recommended]
Building Code Compliance
Construction work can be carried out according to the tenant's wishes, but it is necessary to follow the building's regulations and approval procedures. Before starting construction work, be sure to thoroughly check the building's management regulations and restrictions on construction work.
Quality Control
Since C construction allows a company to select contractors on its own, proper quality control is required. Measures to ensure quality are required, such as selecting reliable contractors, regular checks during construction, and inspections after completion.
Consideration for neighboring tenants
As with construction work B, be considerate of neighboring tenants and take appropriate measures, such as giving advance notice and adjusting construction hours.
If you want your office relocation or renovation to proceed smoothly, leave it to ITOKI!

In order to smoothly proceed with an office relocation or renovation, it is important to correctly understand the three construction divisions and make appropriate plans. However, for those with little experience, it may seem somewhat complicated and difficult.
At ITOKI, we leverage our many years of experience and extensive track record to provide comprehensive support for office relocation and renovation projects. We offer one-stop support for the entire project, from selecting a relocation site to planning, various applications, negotiating with the building owner, construction, moving, and restoration work.